2/11/2023 0 Comments Vinyl siding installation video![]() ![]() Drill drainage holes every 2 feet along the face of the bottom J-Channel prior to installation. Apply J-Channel along the top and bottom of the walls to receive the siding panels. Snap a base line 1" above the low part of the house. NOTE: Unlike the preparation for horizontal siding, do not install a starter strip for vertical siding. Install outside and inside cornerposts using dimensions and procedures NOTE: When installing vertical siding in high wind areas, position the fasteners at the top two nail slots of the panel Cornerposts However, instead of snapping a chalk line 2-1/4" above the low point, snap it 1" above the low point. ![]() The procedure is virtually the same as that described earlier. Read more about measuring vinyl siding Marking a base line ![]() The need for this added step depends on the type of substrate used and the nature of the construction project. With vertical siding, however, you may have to complete an extra step to provide solid nailing points along the vertical edge of the siding panel. Always check with your local building code official. NOTE: Never install vinyl siding over open furring strips or studs. The key requirement, of course, is that you start with a smooth, level and rigid substrate (plywood, wood composite, rigid foam or fiber sheathing). For the most part, the wall preparation instructions given for horizontal siding also apply to vertical applications.
0 Comments
Leave a Reply. |
AuthorWrite something about yourself. No need to be fancy, just an overview. ArchivesCategories |